Metro Rail tested on eleveted corridor

Seven months after the first train manufactured for Chennai Metro Rail a Sao Paulo, Brazil hit the city’s port, it  went through the much – awaited trial run on the elevated-track from the Koyambedu depot on Jan. 30. The trial run covered less than two km. and did not cross the Koyambedu Metro station. It will go through this exercise for another 15 days, after which the train will lie tested extensively from Koyambedu up to Ashok Nagar.

Leave a Reply